BEAM OR PASSIVE BUDGET SCAFFOLD ALARM QUOTATION - STEP 1:
INCLUDES 4 WEEKS HIRE
Please select the number of weeks and the number of scaffold
elevations required:
| Elevations/Sides: |
50m maximum lenght, 5 scaffold board wide, 1st scaffold lift or 1st floor level of building. |
|
|
| Alarm detection
equipment: |
Beam detectors - Max 50m range |
| |
or |
| Alarm detection
equipment: |
Passive detector - Up to 25m range range each |
|